Establishment of Tier III Data Center at PKLI Hospital

IDAP-PKLI (LAHORE-PAKISTAN) Pakistan awarded a project to CMC to build its new state of the art (MODULAR RATING/Tier- III, ITDC’s having complete Paths and Components level Redundancy from day one as special add-on) for Modular POD based ITDC Facilities.

The Primary ITDC Facility site based in Lahore was supposed to perform seamless uninterrupted ITDC Facilities services for their business continuity and be electronically connected through housed data server(s)/Networks. The system’s objective is to standardize its Data Centre in Islamabad with alignment of IT/Facility infrastructure.

The project covers some more enhancements related to Modular cooling and power infrastructure requiring for this Data Centre is more concerned to the provision of XLPE electrical power cables supplies ( where applicable), ASTA certified switchboards and building services including civil Platform modifications Upgradation and complete fit out services to achieve a facility that must exceeds/meet/Attain Rating/Tier III 99.998% uptime®/TIA942A/B® design benchmark against “The Industry Standard Tier Classification System” developed (see below chart as specimen). However the design meets Tier III conformance due to Dual Utility Transformers assumption and Number of IT Racks for IT Availability upto Twelve IT Racks along with future growth upto 16 IT Rack on pay as you grow model as it holds all major facility components in design having complete Paths and Components level Redundancy from day one as special add-on).